ExperimentalWe used data and feedback to make a user-friendly site. We’d love your feedback.
Back to data.ca.gov.

Search results

Search results

188 datasets

Utility Hydroelectric Generation by Size and County: 2021

  • Published by: California Energy Commission
  • Last updated: Wednesday, January 21, 2026
  • File types: HTML

This document provides a map of California and at each county a pie-chart depicts the proportion of utility-scale electrical production capacity comin...

Utility Hydroelectric Generation by Size and County: 2019

  • Published by: California Energy Commission
  • Last updated: Wednesday, January 21, 2026
  • File types: HTML

This document provides a map of California and at each county a pie-chart depicts the proportion of electrical generation from small or large hydroele...

Utility Hydroelectric Generation by Size and County: 2018

  • Published by: California Energy Commission
  • Last updated: Wednesday, January 21, 2026
  • File types: HTML

This document provides a map of California and at each county a pie-chart depicts the proportion of electrical generation from small or large hydroele...

Utility Hydroelectric Capacity by Size and County: 2018

  • Published by: California Energy Commission
  • Last updated: Wednesday, January 21, 2026
  • File types: HTML

This document provides a map of California and at each county a pie-chart depicts the proportion of utility-scale electrical production capacity comin...

Utility Hydroelectric Capacity by Size and County: 2019

  • Published by: California Energy Commission
  • Last updated: Wednesday, January 21, 2026
  • File types: HTML

This document provides a map of California and at each county a pie-chart depicts the proportion of utility-scale electrical production capacity comin...

DC fast charging stations that do not meet NEVI but within 1-mile of a corridor March 2024

  • Published by: California Energy Commission
  • Last updated: Wednesday, January 21, 2026
  • File types: HTML, ARCGIS GEOSERVICES REST API, CSV, ZIP, GEOJSON, KML

Locations of DC fast charging stations that do not meet NEVI power-level or port count requirements (as of March 2024) but are within 1-mile of a corr...

Utility Hydroelectric Capacity by Size and County: 2021

  • Published by: California Energy Commission
  • Last updated: Wednesday, January 21, 2026
  • File types: HTML

nergy generation data and map are from the California Energy Commission.Map depicts utility scale hydroelectric capacity, with large hydroelectriccapa...

Regional Transportation Planning Agencies

  • Published by: California Energy Commission
  • Last updated: Wednesday, January 21, 2026
  • File types: HTML, ARCGIS GEOSERVICES REST API, CSV, ZIP, GEOJSON, KML

The list of California Transportation Planning Agencies is current as of February, 2014, provided by Division of Transportation Planning, Office of Re...

NEVI 3 Needed Locations (November 3 2025)

  • Published by: California Energy Commission
  • Last updated: Thursday, January 22, 2026
  • File types: HTML, ARCGIS GEOSERVICES REST API, CSV, ZIP, GEOJSON, KML, TXT, XLSX, GPKG, GDB

The CEC has divided the federally-designated Alternative Fuel Corridors (AFCs) into twenty-three (23) Corridor Groups for the purpose of making NEVI f...

Draft Protected Areas Exclusion (Solar) for 2026-2027 IRP

  • Published by: California Energy Commission
  • Last updated: Thursday, January 22, 2026
  • File types: HTML, ARCGIS GEOSERVICES REST API, CSV, ZIP, GEOJSON, KML

The geospatial data reflected in this Protected Area Layer contain minor data versioning and consolidation updates from the previous Protected Area La...